The Miller's House Remodeling Project

- sort w/newest first -
Walkthrough/Purchase Agreement Time (7/29/2002)
Day After Closing (9/14/2002)
Out With the Cabinets (9/17/2002)
Wall Destruction! (9/17-18/2002)
A Little Landscaping (9/19/2002)
Downstairs Bathroom Tile (9/20/2002)
Installing Strongbacks (9/29/2002)
Ripped Up Floors (10/3/2002)
New Laundry Room Border (10/6/2002)
Installing the Toilet/2x10s (10/12/2002)
Kitchen Cabinet Drawings (10/16/2002)
Starting to Run Wires (10/20/2002)
Soffit Destruction! (10/22/2002-10/25/2002)
Preparing Kitchen Window Opening (10/27/2002)
Upstairs Bathroom Demolition (11/1/2002-11/2/2002)
Installing Kitchen Window (11/3/2002)
Running More Wires (11/7/2002-11/10/2002)
Insulating and Laying Floor (11/14/2002)
First Layer of Floor (11/16/2002)
Second Layer of Floor (11/21/2002-11/24/2002)
Drywalling the Kitchen (11/24/2002-11/27/2002)
Laying Kitchen & Dining Room Tile (12/1/2002-12/4/2002)
Installing Bathtub and Tiling (12/15/2002)
Border, Border, Border (12/17/2002)
Installing Upstairs Cabinets (12/21/2002)
Tiling Upstairs Bathtub (3/29/2003)
Plumbing Bathroom Sink (4/2/2003)
Doors, Polying, and the Medicine Cabinet (4/13/2003-4/18/2003)
Landscaping a Tree Ring (4/28/2003)
Painting the House (5/24/2003)
Barefoot Waterskiing (6/29/2003)
Building the Loft (7/5/2003)
Cleanup and Organization (7/5/2003-8/31/2003)



© 2002, Tim Miller
Generated by Tim Miller's "Create Web Gallery" Perl Program!