Installing the Toilet/2x10s
(10/12/2002)
Ron Gets Insulation Ready

Ron prepares the insulation for behind the siding. We needed to trim the top of the piece of siding immediately below the 2x10s so the boards could overlap that siding. In order to overlap it effectively, we needed to trim the insulation down. We ended up getting the 2x10s attached tonight, but the joist hangars aren't on yet (which actually hold the deck to the house).


© 2002, Tim Miller
Generated by Tim Miller's "Create Web Gallery" Perl Program!