| Ron Gets Insulation Ready |
Ron prepares the insulation for behind the siding. We needed to trim the top of the piece of siding immediately below the 2x10s so the boards could overlap that siding. In order to overlap it effectively, we needed to trim the insulation down. We ended up getting the 2x10s attached tonight, but the joist hangars aren't on yet (which actually hold the deck to the house). |